Denison Mines Brand Guidelines
From Elliot Lake claims to an Athabasca in-situ recovery mine.
Aa
Two constants: a boreal green, slate and ochre palette and a plain technical sans register. Abstract homage — not a Denison Mines asset or mark; no logo, site photograph or product is reproduced.
Elliot Lake
A uranium name from northern Ontario.
The Denison name belongs to the uranium camp of Elliot Lake, in northern Ontario. The company says its involvement in uranium mining goes back to 1954, when a predecessor of today’s Denison acquired claims in the Elliot Lake region, and that the Denison Mine ran from 1957 to 1992, the longest continuous uranium operation in that area. English Wikipedia credits the founding to Stephen B. Roman, the Slovak-born mining engineer who later entered the Canadian Mining Hall of Fame, and says the company was known for its uranium mining at Blind River and Elliot Lake before diversifying into coal, potash and other projects.
The Elliot Lake years also shaped mine-safety law in Ontario. English Wikipedia records that about 1,000 workers at Denison’s Elliot Lake mines went on strike in 1974 over unhealthy working conditions; the protest led to immediate changes and prompted the province to set up the Royal Commission on the Health and Safety of Workers in Mines, led by James Milton Ham. Denison still looks after its closed mines there: the company says it formed Denison Environmental Services in 1997 to provide decommissioning and care-and-maintenance work, and keeps a technical team in Elliot Lake that monitors its legacy sites.
The Denison of today is a newer legal entity. The company says the modern corporation took shape in 2006, when International Uranium Corp. acquired Denison by plan of arrangement and changed its own name to Denison Mines Corp. It is based in Toronto, where its news releases are datelined, and its shares trade in Toronto as DML and in New York on NYSE American as DNN.
Colour
McClean Lake and a move to the Athabasca.
Denison’s centre of gravity moved west to the Athabasca Basin of northern Saskatchewan. The company says it took a 22.5% interest in the McClean Lake joint venture when it was formed in 1993; mill construction began in 1995, and the mill reached commercial production in 1999 and processed ore until June 2010. From 2014 the McClean Lake mill restarted under a toll-milling agreement to treat ore from the Cigar Lake mine, operated by Cameco. Mining resumed at McClean North in July 2025 with the joint venture’s SABRE borehole method, and Denison credited Orano Canada with commissioning that mine in its results of November 2025.
The portfolio was reshaped through deals. Denison says it sold its US mining division, including the White Mesa Mill in Utah, to Energy Fuels in 2012; bought JNR Resources, Fission Energy and Rockgate Capital in 2013; and sold Rockgate, by then holding its interests in Zambia, Mali and Namibia, to GoviEx Uranium in 2016. English Wikipedia adds that Denison managed the investment fund Uranium Participation Corporation until 2021, when that fund was sold to Sprott.
The flagship is Wheeler River. Denison raised its interest to about 66% in 2017 and bought Cameco’s 24% in 2018; with half of JCU (Canada) Exploration acquired in 2021, the company describes its effective interest as 95%. World Nuclear News reported in February 2026 that the project is a joint venture of Denison (90%) and JCU (10%), and that its Phoenix and Gryphon deposits were discovered by Denison in 2008 and 2014. A 2018 study chose in-situ recovery for Phoenix: a method that dissolves uranium in the ground and pumps the solution to a surface plant.
Typography
Design and documentation.
Uranium companies sell a commodity that few of their audiences will ever see, so their visual material leans on the stages around it. Mining reports and investor decks in this sector commonly show drill core laid out in trays, drums of uranium concentrate, the yellowcake of the trade, and the plants where ore is milled. The product itself is a powder; the imagery is of the places and steps that produce it.
Geography does much of the work. In-situ recovery, the method Kazatomprom uses for all of its production in Kazakhstan, pumps solution through wells rather than digging a pit, so its pictures tend to be wellfields of wellheads and pipework laid across open steppe and prairie. In northern Saskatchewan, the Athabasca Basin, where Cameco mines McArthur River and Cigar Lake, appears as lakes, forest and snow, with headframes and camps in winter light.
The fuel story widens the frame. Companies that sell uranium into conversion, enrichment and fuel fabrication often finish their presentations with nuclear power plants, cooling towers and control rooms, and with the language of low-carbon, reliable electricity; when Cameco and Brookfield completed their purchase of Westinghouse in November 2023, World Nuclear News quoted Cameco’s chief executive on demand for nuclear power and energy security.
Much of this material is made for investors and for the industry itself. Producers and developers publish decks and annual reports for listings in markets such as Toronto, New York, London and Astana, and present at industry events, among them those of the World Nuclear Association, whose public information service is World Nuclear News. This guide sets out what can be checked about each company — its origins, owners and mines — and treats its colours and type as an unofficial interpretation.
Aa
A plain technical sans for project maps, results tables and site signage. (Specimen set in IBM Plex Sans, a sans STAND-IN; NOT the Denison Mines logo.)
Denison Mines
A licence, then construction.
Wheeler River moved from permitting to building in 2026. The Canadian Nuclear Safety Commission announced in February 2026 its decision to issue Denison a licence to prepare a site for and construct the project, a uranium mine and mill about 600 km north of Saskatoon, within Treaty 10 territory and the homeland of the Métis, in the traditional territories of the Denesųłiné, Cree and Métis. The decision followed a two-part public hearing held in Gatineau on 8 October 2025 and in Saskatoon from 8 to 11 December 2025. The licence runs to February 2031 and, the Commission said, does not authorise operation, which would need a further licensing hearing. World Nuclear News reported that Phoenix will be the first uranium mine in Canada to use in-situ recovery.
Denison announced its final investment decision soon after, and said on 28 July 2026 that site preparation was complete and full-scale construction had begun. In its third-quarter results of 4 November 2026 the company put total completion at about 24% and said it was targeting first production in the second half of 2028; Phoenix is not yet in production. The provincial environmental approval came in July 2025; a judicial review of it filed by the Peter Ballantyne Cree Nation in 2025 was withdrawn in July 2026, with the Nation confirming its support, the company said. Denison says it signed agreements with Indigenous communities from 2017 onward, including the English River First Nation in 2021, and adopted an Indigenous Peoples Policy in December 2021.
For a design guide, Denison Mines shows how an old mining name can be carried into a new kind of project: a company that began with underground mines in Ontario now reports on wellfields, freeze-well drilling and the percentage of construction completed. Compare Cameco, its long-time partner in the Athabasca Basin, and Orano, which operates McClean Lake. For this guide we use a boreal green, a lake slate and an ore ochre with a sans, an unofficial interpretation; no product or logo is reproduced.
Explore & save
Keep Denison Mines’s identity on hand — save it to a board in the Made Good inspiration library.
Denison Mines identity set
Pin the Denison Mines boreal green, slate and ochre palette and the plain technical sans register to your own board.



